Mozambique: Sasol/EDM JV inaugurates CTRG


Issue 284 - 12 Sep 2014 | 1 minute read

The Central Térmica de Ressano Garcia (CTRG) joint venture between Electridade de Mozambique (EDM) and South Africa’s Sasol was inaugurated in a ceremony on 28 August. The 175MW power plant will run on gas from Sasol’s central processing facility at Temane, in Inhambane Province. The plant, which will reach full operation in October, is owned 51% by EDM and 49% by Sasol. It is equipped with 18 Wärtsilä engines of 9.8 MW each – 16 for basic power generation duty, plus two for maintenance/standby and to increase the availability of the basic plant.

Tagged with:

Pin Power, Resources

Pin Mozambique

Want to read more?

Subscribe to African Energy

View subscription options

Don't have an account?

Register for access to our free content

An account also allows you to view selected free articles, set up news alerts, search our African Energy Live Data power projects database and view project locations on our interactive map

Register