Loading of the first liquefied natural gas (LNG) cargo from Eni’s 3.4m t/yr Coral Sul floating liquefied natural gas (FLNG) plant is due to take place on 14 November, an industry source told African Energy.
Tagged with:
Related topics:
Subscribe to African Energy