Algeria: Petroceltic launches Ain Tsila development drilling


Issue 318 - 25 Feb 2016 | 1 minute read

. Petroceltic International has announced the start of development drilling on the Ain Tsila gas and condensate field. The newly built Sinopec rig 50117 arrived on the Isarene permit in November 2015 and was assembled on site. Development well AT-10 spudded on 21 February. AT-10 is located in the north of the field, some 3.4km from the field discovery well AT-1, and 2km from the appraisal well AT-8, which both delivered gas flow rates of more than 30mcf/d on test. The vertical well is targeting the Ordovician reservoir formation to a planned total depth of 1,989 metres.

Tagged with:

Pin Algeria

Want to read more?

Subscribe to African Energy

View subscription options

Don't have an account?

Register for access to our free content

An account also allows you to view selected free articles, set up news alerts, search our African Energy Live Data power projects database and view project locations on our interactive map

Register