State-owned utility Office National de l’Electricité et de l’Eau Potable (Onee) has issued a tender for the construction of a 900MW open cycle gas turbine (OCGT) power plant adjacent to Al-Wahda dam and the Maghreb-Europe Gas Pipeline (GME). The project’s estimated cost is MD6bn ($592m).
Subscribe to African Energy