Golar LNG Limited has announced a preliminary agreement and heads of terms with BP for front-end engineering design work on a floating liquefied natural gas vessel to support the development of Phase 1A of the Greater Tortue/Ahmeyim field. The agreement follows contracts with TechnipFMC for the floating production, storage and offloading vessel, and with McDermott International and Baker Hughes for the subsea element.
Tagged with:
Subscribe to African Energy