Revised in July 2022, this map provides a detailed view of the power sector in Tunisia. The locations of power generation facilities that are operating, under construction or planned are shown by type – including gas and liquid fuels, natural gas, hybrid, hydroelectricity, solar (PV and CSP), wind and biomass/biogas.

Major substations are indicated as are power generation projects with battery storage.

Generation sites are marked with different sized circles to show sites of 1-9MW, 10-99MW, 100-499MW and 500MW and above.

Existing and future transmission and distribution lines are shown ranging from 90kV to 400kV. Actual and planned cross-border interconnectors are also shown including the Elmed Interconnector and lines to Algeria and Libya.

An inset provides greater detail for the area around Tunis.

Power generation data was drawn from our African Energy Live Data platform, which contains project level detail on power plants and projects across Africa.

The map is presented as a PDF file using eps graphics, meaning that there is no loss of resolution as the file is enlarged.

 

Single African Energy map

£895

(1 standard map)

Subscribe to African Energy

View subscription options

Don't have an account?

Register for access to our free content

An account also allows you to view selected free articles, set up news alerts, search our African Energy Live Data power projects database and view project locations on our interactive map

Register

Interested in more than one map?

The African Energy Atlas is the essential reference book for all energy professionals working in Africa, with maps, graphics and articles covering all aspects of the energy sector.

Take a closer look