The Public Utilities Corporation (PUC) has signed a €21.8m ($23.5m) deal with Belgium’s International Montage Maintenance (IMM) to add 18MW of capacity to the 66.4MW Roche Caiman thermal baseload plant in Mahé.
Subscriber only content
An active subscription is required to view this article
Subscribe to African Energy