Swaziland: Consultancy services sought for solar PV project


30 Jan 2018 | 1 minute read

The Swaziland Water Services Corporation (SWSC) has issued a request for proposals from consultancy firms by the 23 February for the development of a 5-10MW solar photovoltaic (PV) plant. Letters of intent are sought by 2 February.

The consultant will undertake feasibility studies and conceptual design work; carry out a transmission and interconnection study; conduct an environmental and social impact assessment; develop an implementation plan and carry out capacity building; assist with procurement of construction contractors; work as the owner’s engineer and manage contracts. Work is expected to last until Q4 2019, when the plant is expected to commission.

SWSC uses around 30GWh/yr, which is expected to rise to 32GWh/yr as new water stations come online. According to the utility, electricity is the single highest input cost driver in the water supply. As a result, SWSC is looking to develop a solar plant on a 158ha site adjacent to the existing Matsapha waste water treatment plant.

Contact: The Managing Director, Swaziland Water Services Corporation Headquarters, Emtfonjeni Building, Corner MR 103 and Cultural Village Road, Ezulwini. Email: [email protected] Telephone: +268 24 16 9000 Fax: +268 2416 3618/20.

Request a Live Data demonstration

Contact Alex Wark to see an in-person demo of the platform and explore subscription options.

We can answer any questions you may have and discuss how the platform can be best used to help your business.

Tel: +44 1424 721667

Or request a 30 min platform demo

How we source our data