WAPP interconnection studies awarded


Issue 147 - 05 Oct 2008 | 1 minute read

The West African Power Pool (WAPP) secretariat has awarded two contracts for studies for the Côte d’Ivoire-Liberia-Sierra Leone-Guinea (CLSG) interconnection

Tagged with:

Pin Power

Pin Sierra Leone, Guinea, Liberia

Want to read more?

Subscribe to African Energy

View subscription options

Don't have an account?

Register for access to our free content

An account also allows you to view selected free articles, set up news alerts, search our African Energy Live Data power projects database and view project locations on our interactive map

Register