Serengeti Energy has secured a $10.6m, 17-year term loan from the Private Infrastructure Development Group’s Emerging Africa Infrastructure Fund (EAIF) for the 7.8MW Nyamwamba II run-of-river hydroelectric power (HEP) plant.
Subscribe to African Energy