A joint venture of Genoa-based Rina and Tunisia’s Comete Engineering has won a contract for a marine feasibility study for the long-anticipated 600MW Italy-Tunisia Interconnection.
Tagged with:
Related topics:
Can Tunisia’s huge renewable energy opportunity prevail against its terrible politics?
Access via a report
Subscribe to African Energy