With blackouts raging, South African efforts to bring new capacity online face global headwinds. Both the latest Renewable Energy IPP Procurement Programme (REIPPP5) and the Risk Mitigation IPP Procurement Programme (RMIPPP) are being hampered by rising component and engineering costs.
Tagged with:
Related topics:
Has ailing Eskom been left behind in South Africa’s private sector power boom?
Access via a report
Subscribe to African Energy