An internal report by Zambia’s Meteorological Department seen by African Energy has warned that a plan to take water from the Luapula river in the north and pump it to the hydroelectric plants on the Kafue river in the south could cause severe harm to the ecosystem.
Tagged with:
Related topics:
Subscriber only content
An active subscription is required to view this article
Subscribe to African Energy