Office National de l’Electricité et de l’Eau Potable (ONEE) is making progress with its 850MW Integrated Wind Project. The utility announced on 6 January that the 210MW Midelt wind farm has begun commercial operations. The plant is located on a 2,300ha site 8km north-east of Midelt. It is owned by ONEE, Italy’s Enel Green Power and Morocco’s Nareva Holding.
Subscribe to African Energy