Liberia: RREA seeks consultants for Gbedin Falls


Tender
Issue 412 - 26 Mar 2020 | 1 minute read

The Rural and Renewable Energy Agency invites expressions of interest from engineering consultancy firms by 6 April to prepare detailed designs, bidding documents, tendering and supervision of works for the construction of the 9.34MW Gbedin Falls run-of-river hydropower plant and associated distribution system infrastructure.

Tagged with:

Pin Power

Pin Liberia

Want to read more?

Subscribe to African Energy

View subscription options