As demand surges, Kenya is looking to new power developments and imports from the Eastern Africa Power Pool to increase on-grid capacity, with KenGen advancing a new fleet of renewable projects, while a vital new interconnector with Tanzania has been energised and there are signs the IPP moratorium could soon end, writes Marc Howard, recently in Nairobi.
Subscriber only content
An active subscription is required to view this article
Subscribe to African Energy