Gabon: Southeast Etame development well


Issue 305 - 24 Jul 2015 | 1 minute read

Houston-based Vaalco Energy said on 20 July the Southeast Etame 2-H well had been brought on line at a rate of 3,400 b/d. The well is the first to be drilled and placed on production at the new Southeast Etame/North Tchibala (SEENT) platform (AE 287/12). The well was drilled to a depth of 4,270 metres, targeting a new reservoir discovered in 2010 in the Gamba formation. The Transocean Constellation II jack-up rig has now been moved to a second slot on the same platform to drill the North Tchibala 1-H well targeting the Dentale formation in another previously unproduced field, North Tchibala.

Tagged with:

Pin Resources

Pin Gabon

Want to read more?

Subscribe to African Energy

View subscription options

Don't have an account?

Register for access to our free content

An account also allows you to view selected free articles, set up news alerts, search our African Energy Live Data power projects database and view project locations on our interactive map

Register