Ethiopia: Two new transmission line tenders


Tender
Issue 256 - 14 Jun 2013 | 1 minute read

The Ethiopian Electric Power Corporation is inviting bids for the design, manufacture, installation and commissioning of two transmission line packages. The first involves construction of a 132kV single circuit line connecting the 460MW Beles hydroelectric power plant to Beles Sugar Factory and supply of ancillary equipment for a 230kV transmission line. The second is to build a 230kV line from Welayita Sodo II to Omo Kuraz Sugar Factory and a 132kV transmission line from Sugar Factory 1 to Sugar Factory 5. Bid documents will be available from 17 June, with bids due by 20 August.

Tagged with:

Pin Power

Pin Ethiopia

Want to read more?

Subscribe to African Energy

View subscription options

This article is available to registered users

Login

Don't have an account?

Register for access to our free content

An account also allows you to view selected free articles, set up news alerts, search our African Energy Live Data power projects database and view project locations on our interactive map

Register