The recently published 2018 report of the New and Renewable Energy Authority (NREA) has set out a number of priority wind and solar projects in the public and private sectors. This is where most of the activity will take place in Egyptian power generation development over the coming five years as there is now a temporary moratorium on the construction of new thermal capacity.The authority has divided its renewable power pipeline into two: first, projects that are under study, and, second, those that are planned. Those being studied are generally further advanced.
Tagged with:
Related topics:
Subscribe to African Energy