Total announced on 6 May it had started production from the Zinnia Phase 2 short-cycle project in Block 17, connected to the existing Pazflor floating production, storage and offloading (FPSO) unit. The project includes the drilling of nine wells; output is expected to reach 40,000 b/d by mid-2022.
Subscribe to African Energy