Angola: Subsea 7 to build Sanha Lean Gas structure


Issue 431 - 28 Jan 2021 | 1 minute read

Chevron subsidiary Cabinda Gulf Oil Company Limited has given Subsea 7 a contract for the Sanha Lean Gas Connection project in Block 0. The work comprises the construction and installation of a lean gas platform system at a water depth of approximately 70 metres. The lean gas platform is planned as a fixed-leg structure bridge-connected to the existing Sanha condensate complex. Gas from the Sanha field, which started condensate production in 2005, will be supplied to the Angola LNG plant at Soyo.

Tagged with:

Pin Angola

Want to read more?

Subscribe to African Energy

View subscription options

Don't have an account?

Register for access to our free content

An account also allows you to view selected free articles, set up news alerts, search our African Energy Live Data power projects database and view project locations on our interactive map

Register