Eni announced on 9 May that it had completed the ramp-up of the Ochigufu field on Block 15/06 of Angola’s deep offshore, reaching the production plateau of 24,000 b/d. The field started up on 16 March and allows Eni’s operated production from block 15/06 to stabilise above 150,000 b/d, in line with a goal of adding 54,000 b/d to the block’s production by 2019.
Tagged with:
Subscribe to African Energy