Saudi developer Acwa Power has confirmed that the Redstone CSP plant in South Africa should reach its full generating capacity within days. In the 27 october statement, it also said its Kom Ombo solar PV plant in Egypt had reached full production capacity.
Subscriber only content
An active subscription is required to view this article
Subscribe to African Energy