Zambian IPP Ndola Energy Corporation has extended the O&M deal for Wärtsilä engines as its 105MW HFO plant continues a decade-long arrangement. The IPP has become vital to Zambia’s electricity supply, at a time when the country’s hydroelectric power (HEP) plants are suffering a dramatic fall in output due to drought.
Subscriber only content
An active subscription is required to view this article
Subscribe to African Energy