412

Kangnas Wind Farm announced the installation of all 61 Siemens SWT-2.3-108 turbines on 17 March, two weeks ahead of schedule. The 140MW wind farm is expected to come online by September, generating about 563.5GWh/yr.South Africa’s Concor and Conco Group are joint engineering, procurement and construction contractors, with Siemens providing equipment, operations and services under a ten-year service agreement.