415

Office National de l’Electricité et de l’Eau Potable has invited technical and financial proposals from consultants by 6 July for studies to optimise the operation and evaluate the potential of the Afourer hydropower complex. The contract will entail studies to improve, optimise and integrate a series of modifications in the design and operation of the complex, in pumped storage and in conventional hydropower mode, to increase its production and efficiency.