412

The Rural and Renewable Energy Agency invites expressions of interest from engineering consultancy firms by 6 April to prepare detailed designs, bidding documents, tendering and supervision of works for the construction of the 9.34MW Gbedin Falls run-of-river hydropower plant and associated distribution system infrastructure.