375

In his first news conference on 25 August, Prime Minister Abiy Ahmed confirmed significant problems with the 6.45GW Grand Ethiopian Renaissance Dam (Gerd) on the Blue Nile River. But rather than address the lengthy ongoing spat with Cairo over the $4bn project, or chief engineer Semegnew Bekele’s death in central Addis Ababa in a mysterious 26 July shooting, Abiy’s comments shed more light on a distinctly domestic dispute.He blamed military-linked state contractor Metals and Engineering Corporation (Metec) for the delays.